Clean Currents 2026!
We are honored to be exhibiting at booth #1218 at Clean Currents 2026! Join us with the National Hydropower Association in Phoenix, AZ, at the industry’s top event to showcase the power of water!
Read MoreWe are honored to be exhibiting at booth #1218 at Clean Currents 2026! Join us with the National Hydropower Association in Phoenix, AZ, at the industry’s top event to showcase the power of water!
Read MoreIntroducing the Endura Pad – Hydro Tech’s PTFE generator thrust pad engineered for hydroelectric generating units. Fully engineered and manufactured in Canada, the Endura Pad offers a high-performance alternative to traditional Babbitt thrust bearings, which can be sensitive to increased loads, low-speed operation, elevated oil temperatures, contamination, and lubrication challenges. Key advantages include:• Higher specific […]
Read MoreFOR IMMEDIATE RELEASE Hydro Tech Inc. recognized in HRDC Best Places to Work 2026 Ontario, Canada – July 20, 2026 – Hydro Tech Inc. has been named one of the country’s top employers in the Human Resources Director Canada Best Places to Work 2026 report, recognizing organizations that excel in employee engagement, workplace culture, and […]
Read MoreWe are proud to welcome, Brittany Sims to our Hydro Tech team! With over a decade of procurement experience, Brittany has supported complex, project-based purchasing across several Ontario public-sector organizations. Her background includes competitive sourcing, contract administration, vendor management, and maintaining audit-ready documentation in highly regulated environments. Throughout her career, she has procured […]
Read MoreWe’re excited to welcome Melanie Thornborrow to the Hydro Tech team as our HSE Specialist! Melanie brings over 15 years of experience in health and safety, building on a career that began in Human Resources more than 20 years ago. She holds a CES ergonomics designation, an NCSO certificate, and has served as a COR […]
Read MoreHydro Tech is proud to announce that we have been awarded the Mt. Elbert Rotor Redesign Project for the 100 MW pumped storage generator in Colorado, under contract with the U.S. Bureau of Reclamation (USBR). This project involves the engineering and supply of a new 25.5 foot rotor to address longstanding design issues that have […]
Read MoreWe are excited to announce a new edition to our Project Management team, Stephen brings with him an extensive background in operations, financial leadership, and process optimization, with experience spanning both public and private sectors. He holds an MBA with a concentration in Finance, and has held key roles in organizations such as Algoma Steel, […]
Read More