Akosombo GS – 1020 MW PTFE Thrust Bearing Solution
After installing high-performance turbine runners during a major overhaul, Akosombo GS had experienced increased thrust bearing operating temperatures and cavitation …
After installing high-performance turbine runners during a major overhaul, Akosombo GS had experienced increased thrust bearing operating temperatures and cavitation …
Hydro Tech was called to the Dolgeville Generating Station in January 2018 to review the history of seal failures that …
A single unit station had experienced recurrent thrust bearing failures. The unit is a 9000 HP, Kaplan-type runner that started …
After a 90 MW generator’s thrust bearing failed it was determined the best path forward was to install PTFE lined …